š Up to 70% Off Selected Items
Shop Sale
ā
Entertainment
Home Appliances
Smart Living
Account
Home
Store
Aircon Additional Charges
Aircon Additional Charges
Select Additional Charges
15A Power Point - Supply and Replace Item Only (Same Location)
20A Isolator - Supply and Install Item with Wire
3C70 Wire - Supply and replace (>3m)
20A Isolator - Supply and Replace Item Only (Same Location)
Door Frame - 9mm Plywood Board Up
Ducted Unit - Dismantle and Disposal of Existing
Cornice - Modification (with Patching)
Ceiling/Partition Work/Box Up - Cutting, Patching and Touch Up
Cornice - Modification (without Patching)
Aircon Pressure Test - Excludes Gas Top-up (Min 2 Sets)
Door Frame - 3.5mm White PVC Plywood Board Up, Dual-Sided
Existing CU - Disassembly and Removal (Insufficient Window Height)
Ducted Vents - Supply Labour and Materials for Removal
Gas Top-up - R32
Galvanized Steel Cable Tray - Supply and Install (After First 3m)
Gas Top-up - R22
Galvanized Steel Cable Tray - Supply and Install (First 3m)
Extra Trip - Installation
Hacking and Concealment - Drainage Pipe (More Than 5m)
Hacking and Concealment - Drainage Pipe (5m or Less)
Insulation Upgrade - 3/4" Armaflex Class "0" Insulation
Hacking and Concealment - Refrigerant Pipe up to 3m
L-Box (Min 2m) - Hacking, Disposal and Patching (Nail/Screw/Wall Plug Holes Only)
Gas Top-up - R410
Hacking and Concealment - Refrigerant Pipe (FCU Up to Ceiling, Within 1 ft) Excluding Painting
Other Brands FCU Installation - 18K
Other Brands FCU Installation - 9K/12K
Long Pipe Run - 15m to 20m
Other Brands FCU Installation - 24K
Non HDB / Non standard Installation
Pelmet - Creation (1 Pelmet)
Long Pipe Run - 20m to 25m
S/STEEL HANGING BRACKET (SS304) - 410mm x 1000mm
Pelmet - Modification
Relocation -Other Brand FCU (Reduce Pipe Length or Extend Piping Up to 2m)
Pelmet - Creation (Multi)
S/STEEL LONG L - BRACKET (SS304) - 410mm x 1000mm
Pipe Run Route - False Ceiling/Partition Wall/Box Up
Scaffolding (5m - 6m)
Stairs - Equipment Carry
S/STEEL Window Opening BRACKET (SS304) - 410mm x 1000mm
Water Tray - Supply and Install (NEA Approved)
Water Pump - Supply and Install (Internal)
Water Pump - Supply and Install (External) with 3/8" Hose
S/STEEL NORMAL L BRACKET (SS304) - 410mm x 1050mm
Window Opening - Aluminium sheet and Plywood
Window Opening - Plywood
Window Opening - Aluminium sheet
PRISM+ FCU Relocation - 9K/12K
Relocation - PRISM+ FCU (Reduce Pipe Length or Extend Piping Up to 2m)
Working at Height (>3.5m)
S/STEEL NORMAL L BRACKET (SS304) - 410mm x 1000mm
Priority Installation
PRISM+ FCU Relocation - 18K
15A Powerpoint - Supply and Install Item with Wire
Condenser Upgrade
PRISM+ FCU Relocation - 24K
Dismantling of Existing AC system W/O disposal
From
$2.34
Original:
$7.80
-70%
Select options
Aircon Additional Charges
ā
$7.80
$2.34
Select options
Select variant
Product Information
Shipping & Returns
Select Additional Charges
15A Power Point - Supply and Replace Item Only (Same Location)
20A Isolator - Supply and Install Item with Wire
3C70 Wire - Supply and replace (>3m)
20A Isolator - Supply and Replace Item Only (Same Location)
Door Frame - 9mm Plywood Board Up
Ducted Unit - Dismantle and Disposal of Existing
Cornice - Modification (with Patching)
Ceiling/Partition Work/Box Up - Cutting, Patching and Touch Up
Cornice - Modification (without Patching)
Aircon Pressure Test - Excludes Gas Top-up (Min 2 Sets)
Door Frame - 3.5mm White PVC Plywood Board Up, Dual-Sided
Existing CU - Disassembly and Removal (Insufficient Window Height)
Ducted Vents - Supply Labour and Materials for Removal
Gas Top-up - R32
Galvanized Steel Cable Tray - Supply and Install (After First 3m)
Gas Top-up - R22
Galvanized Steel Cable Tray - Supply and Install (First 3m)
Extra Trip - Installation
Hacking and Concealment - Drainage Pipe (More Than 5m)
Hacking and Concealment - Drainage Pipe (5m or Less)
Insulation Upgrade - 3/4" Armaflex Class "0" Insulation
Hacking and Concealment - Refrigerant Pipe up to 3m
L-Box (Min 2m) - Hacking, Disposal and Patching (Nail/Screw/Wall Plug Holes Only)
Gas Top-up - R410
Hacking and Concealment - Refrigerant Pipe (FCU Up to Ceiling, Within 1 ft) Excluding Painting
Other Brands FCU Installation - 18K
Other Brands FCU Installation - 9K/12K
Long Pipe Run - 15m to 20m
Other Brands FCU Installation - 24K
Non HDB / Non standard Installation
Pelmet - Creation (1 Pelmet)
Long Pipe Run - 20m to 25m
S/STEEL HANGING BRACKET (SS304) - 410mm x 1000mm
Pelmet - Modification
Relocation -Other Brand FCU (Reduce Pipe Length or Extend Piping Up to 2m)
Pelmet - Creation (Multi)
S/STEEL LONG L - BRACKET (SS304) - 410mm x 1000mm
Pipe Run Route - False Ceiling/Partition Wall/Box Up
Scaffolding (5m - 6m)
Stairs - Equipment Carry
S/STEEL Window Opening BRACKET (SS304) - 410mm x 1000mm
Water Tray - Supply and Install (NEA Approved)
Water Pump - Supply and Install (Internal)
Water Pump - Supply and Install (External) with 3/8" Hose
S/STEEL NORMAL L BRACKET (SS304) - 410mm x 1050mm
Window Opening - Aluminium sheet and Plywood
Window Opening - Plywood
Window Opening - Aluminium sheet
PRISM+ FCU Relocation - 9K/12K
Relocation - PRISM+ FCU (Reduce Pipe Length or Extend Piping Up to 2m)
Working at Height (>3.5m)
S/STEEL NORMAL L BRACKET (SS304) - 410mm x 1000mm
Priority Installation
PRISM+ FCU Relocation - 18K
15A Powerpoint - Supply and Install Item with Wire
Condenser Upgrade
PRISM+ FCU Relocation - 24K
Dismantling of Existing AC system W/O disposal
From
$2.34
Original:
$7.80
-70%
Select options
Aircon Additional Charges
ā
$7.80
$2.34
Select options
Select variant
Aircon Additional Charges | PRISM+ Singapore